Works 2020

2020 Work report for Dixence Resort Spa and Hotel Centre in Hérémence: the first highlight of 2020 was undoubtedly the installation of the modular chalets
Train de tiges dans le cadre du forage de prospection pour l’eau thermale - Combioula

Prospecting drilling for thermal water – Combioula

,
As part of the construction of the Dixence Resort Thermal Centre, La Foncière de la Dixence SA has mandated BEG SA Géologie & Environnement to monitor prospecting drilling intended to define the existing thermal water reservoir in Combioula

The installation of prefabricated guestrooms

Work report for Dixence Resort project: installation of prefabricated timber hotel rooms
Vue sur les montagnes valaisannes depuis Hérémence | Complexe hôtelier et résidence Dixence Resort

Works 2019

We have now completed the first two apartment buildings : Aiguilles Rouges & Tête Blanche, which is an achievement in itself, and establishes the architecture of the complex, allowing one to imagine the sense of place that will be created by the whole.
Chambres préfabriquées modubois SA | Complexe hôtelier & résidence Dixence Resort

Prefabricated timber hotel rooms – modubois sa

While construction works were going full tilt on site, the timber hotel bedrooms were under fabrication in a workshop,  and are now completely finished, bathrooms and all and ready to be lifted into place and “plugged in” in Hérémence.
Chantier 2018 projet Dixence Resort

Progress report

,
We broke ground at the end of 2016. Little by little the excavation work started to change the form of the landscape, with  slopes and terraces creating the seat from which the thermal centre and hotel complex could evolve.